| No. Ruas | 33.20.120.22 |
| Nama Ruas | Slamet Riyadi |
| Panjang (km) | 0.611 |
| Lebar (m) | 4 m |
| Status | Jalan Kabupaten |
| Fungsi |
| No | No Jembatan | Nama Jembatan |
|---|---|---|
| 1 | 33.20.120.22.01 | Slamet Riyadi 1 |
| 2 | 33.20.120.22.02 | Slamet Riyadi 2 |
| Kondisi | 2023 | 2024 |
|---|---|---|
| Baik | 0.00 | 0.00 |
| Sedang | 0.61 | 0.51 |
| Rusak Ringan | 0.00 | 0.00 |
| Rusak Berat | 0.00 | 0.10 |
| STA | 100 | 200 | 300 | 400 | 500 | 600 | 611 |
|---|---|---|---|---|---|---|---|
| Panjang (m) | 100 | 100 | 100 | 100 | 100 | 100 | 11 |
| Tipe Drainase (Kiri) | Tidak Ada | Tidak Ada | Tidak Ada | Pasangan Batu Tertutup | Pasangan Batu Terbuka | Pasangan Batu Tertutup | Pasangan Batu Tertutup |
| Tipe Bahu (Kiri) | Beton | Beton | Beton | Beton | Beton | Beton | Beton |
| Perkerasan | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal |
| Tipe Bahu (Kanan) | Beton | Beton | Beton | Beton | Beton | Beton | Beton |
| Tipe Drainase (Kanan) | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada |
| Kondisi | Sedang | Sedang | Sedang | Sedang | Rusak Berat | Sedang | Sedang |
| Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto |
| No | Tahun | Pekerjaan | Panjang | Lebar | Jenis Konstruksi | Lokasi | Pelaksana | Sumber Dana |
|---|