| No. Ruas | 33.20.20.14 |
| Nama Ruas | Pecangaan - Sowan Lor |
| Panjang (km) | 3.529 |
| Lebar (m) | 6 - 8 m |
| Status | Jalan Kabupaten |
| Fungsi |
| No | No Jembatan | Nama Jembatan |
|---|---|---|
| 1 | 33.20.020.14.01 | Ds. Troso |
| 2 | 33.20.020.14.02 | Ngeling 1 |
| 3 | 33.20.020.14.03 | Ngeling 2 |
| 4 | 33.20.020.14.04 | Ngeling 3 |
| 5 | 33.20.020.14.05 | Ngeling 4 |
| Kondisi | 2023 | 2024 |
|---|---|---|
| Baik | 3.43 | 2.23 |
| Sedang | 0.00 | 1.30 |
| Rusak Ringan | 0.10 | 0.00 |
| Rusak Berat | 0.00 | 0.00 |
| STA | 100 | 200 | 300 | 400 | 500 | 600 | 700 | 800 | 900 | 1000 | 1100 | 1200 | 1300 | 1400 | 1500 | 1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | 2400 | 2500 | 2600 | 2700 | 2800 | 2900 | 3000 | 3100 | 3200 | 3300 | 3400 | 3500 | 3529 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Panjang (m) | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 29 |
| Tipe Drainase (Kiri) | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Tertutup | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada |
| Tipe Bahu (Kiri) | Tanah | Tanah | Tanah | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton |
| Perkerasan | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal |
| Tipe Bahu (Kanan) | Tanah | Tanah | Tanah | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton |
| Tipe Drainase (Kanan) | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Pasangan Batu Terbuka | Pasangan Batu Terbuka | Pasangan Batu Tertutup | Pasangan Batu Tertutup | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada |
| Kondisi | Baik | Sedang | Baik | Sedang | Baik | Sedang | Baik | Baik | Baik | Baik | Baik | Sedang | Sedang | Sedang | Sedang | Baik | Baik | Sedang | Sedang | Sedang | Baik | Sedang | Sedang | Baik | Sedang | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Baik |
| Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto |
| No | Tahun | Pekerjaan | Panjang | Lebar | Jenis Konstruksi | Lokasi | Pelaksana | Sumber Dana |
|---|