| No. Ruas | 33.20.30.10 |
| Nama Ruas | Manyargading - Guwosobokerto |
| Panjang (km) | 3.181 |
| Lebar (m) | 4 - 6 m |
| Status | Jalan Kabupaten |
| Fungsi |
| No | No Jembatan | Nama Jembatan |
|---|---|---|
| 1 | 33.20.030.10.01 | Telukwetan 1 |
| 2 | 33.20.030.10.02 | Telukwetan 2 |
| 3 | 33.20.030.10.03 | Sidigede 1 |
| 4 | 33.20.030.10.04 | Sidigede 2 |
| 5 | 33.20.030.10.05 | Guwosobokerto 1 |
| 6 | 33.20.030.10.06 | Guwosobokerto 2 |
| 7 | 33.20.030.10.07 | Guwosobokerto 3 |
| 8 | 33.20.030.10.08 | Guwosobokerto 4 |
| 9 | 33.20.030.10.09 | Guwosobokerto 5 |
| 10 | 33.20.030.10.10 | Guwosobokerto 6 |
| 11 | 33.20.030.10.11 | Njanglopong |
| Kondisi | 2023 | 2024 |
|---|---|---|
| Baik | 3.18 | 0.90 |
| Sedang | 0.00 | 1.00 |
| Rusak Ringan | 0.00 | 1.28 |
| Rusak Berat | 0.00 | 0.00 |
| STA | 100 | 200 | 300 | 400 | 500 | 600 | 700 | 800 | 900 | 1000 | 1100 | 1200 | 1300 | 1400 | 1500 | 1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | 2400 | 2500 | 2600 | 2700 | 2800 | 2900 | 3000 | 3100 | 3181 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Panjang (m) | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 81 |
| Tipe Drainase (Kiri) | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Pasangan Batu Terbuka | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Pasangan Batu Terbuka |
| Tipe Bahu (Kiri) | Beton | Beton | Beton | Beton | Tanah | Beton | Beton | Beton | Beton | Beton | Beton | Tanah | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton |
| Perkerasan | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal | Aspal |
| Tipe Bahu (Kanan) | Beton | Beton | Beton | Beton | Tanah | Beton | Beton | Beton | Beton | Beton | Beton | Tanah | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton | Beton |
| Tipe Drainase (Kanan) | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Pasangan Batu Terbuka | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada | Tidak Ada |
| Kondisi | Baik | Baik | Baik | Baik | Baik | Baik | Baik | Sedang | Baik | Baik | Sedang | Sedang | Sedang | Sedang | Sedang | Rusak Ringan | Sedang | Rusak Ringan | Rusak Ringan | Rusak Ringan | Rusak Ringan | Rusak Ringan | Rusak Ringan | Rusak Ringan | Sedang | Sedang | Sedang | Rusak Ringan | Rusak Ringan | Rusak Ringan | Rusak Ringan | Rusak Ringan |
| Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto | Foto |
| No | Tahun | Pekerjaan | Panjang | Lebar | Jenis Konstruksi | Lokasi | Pelaksana | Sumber Dana |
|---|